Nashville Precision Concrete forms and pours footings, stem walls and slab-on-grade foundations for new homes, additions, garages and rebuilds around Nashville. Before we set a single form, we confirm what the footing trench will bear on, because in Middle Tennessee that can change from clay to solid rock within the length of one wall.
Nashville is built on Ordovician limestone laid down nearly 500 million years ago, and that rock dissolves over time into the cracks, voids and sinkholes geologists call karst. The U.S. Geological Survey has identified the area as a sinkhole hotspot. Above the rock sits clay residue that holds water and moves with the seasons, so foundation work here is mostly about getting the bearing right.
Our foundation crews serve Brentwood, Franklin, Nolensville, Bellevue, Hermitage, Hendersonville, Murfreesboro, Mt. Juliet, and Spring Hill, plus nearby areas & more. If your lot has shallow rock, read how we handle pouring concrete over Middle Tennessee limestone.

We lay out the foundation from your plans, excavate to firm bearing and inspect the trench bottom with the builder or engineer. Footings, stem walls and slabs are poured to the drawings Metro Codes approved.
Every foundation we pour gets inspected by the local building department before the concrete arrives, which protects you as much as it protects us.

When part of a trench hits limestone and part stays in clay, we follow the engineer's direction, which may mean doweling into rock, over-excavating soft spots or stepping the footing. Pouring one footing across both without a plan is a common source of cracked brick in Nashville.
Rock breaking adds time, so we flag it as soon as we see it.

Additions on older homes in East Nashville, Germantown and Waverly-Belmont need new footings that line up with the original house. We dowel into existing work where the plans call for it so the two parts move together.
Tight urban lots also mean limited room for a concrete truck. We plan pump placement or line pumping ahead of time so the pour happens in one continuous run instead of being stopped for access problems.

The March 3, 2020 EF3 tornado tore through North Nashville, Germantown, Five Points, Donelson, Hermitage and Mt. Juliet, and rebuilding on old foundations is still a question many owners face. We help evaluate what can be reused and pour new footings where the old ones cannot be trusted.
Storm-damaged footings may look fine on top while hiding cracks below grade, so we dig along a section before recommending reuse.

Sloped lots often call for a crawlspace on a stem wall instead of a slab. We pour the footings, form the stem wall and leave vents and access exactly where your plans show them.
On the steeper ground in West Nashville and Bellevue, stepped footings follow the slope down the hill. Each step is formed level so the wall above bears evenly instead of sliding along an incline.

Decks, porches and pergolas sit on individual footings. We auger or hand-dig them, check depth and bearing and pour with anchors set to the plan.
Metro Codes requires a permit for new and replacement decks, so we pour to the footing schedule on the permitted drawings rather than guessing at size and spacing.
We read the plans and any geotechnical report, then visit the lot. If the site shows sinkhole depressions or a history of standing water, we recommend an engineer review before work starts.
Tennessee 811 needs at least three working days' notice, and its rules call for hand digging within about two feet of a marked line. We excavate to bearing and clean the trench bottom.
Rebar goes in on chairs with the cover and laps the plans require. The building inspector signs off on the trench and steel before we schedule concrete.
We pour, vibrate the concrete to remove voids, set anchor bolts and cure. In winter we cover fresh footings with blankets so they never freeze before gaining strength.
It can be. Most lots are fine, but a sinkhole or soft void under a footing can cause sudden settlement. A geotechnical investigation is the right tool when there are warning signs, and we build to its recommendations.
Warning signs include a bowl-shaped dip in the yard, a spot where rainwater disappears fast, or neighbors who have had sinkhole repairs.
Because no one knows exactly where the limestone is until we dig. We price from what we see and recommend a 10 to 15 percent contingency for rock or soft clay found during excavation.
Structural settlement needs an engineer's diagnosis first. For sunken porches, walks or garage floors that are not structural, concrete leveling may be enough.
Yes, see our commercial foundations page for that work.
Nashville gets about 50 inches of precipitation a year. We coordinate footing drains and backfill grading with your builder so water moves away from the walls.
Clay that stays wet against a footing swells and softens, so the first few feet of backfill and the final yard grade matter as much as the concrete.
Framers can often start within a few days of the pour, after the inspector and builder agree the foundation is ready.